This is the design report Trident produces for the made-up house in the Solar Try it. Every figure on this page was worked out by Trident's own engine for this example, not typed in.
Solar PV design report
14 Example Street
- System
- 7 × DMEGC 465 W · 3.25 kWp
- Inverter
- SolaX X1-BOOST-3.6K-G4
- Grid
- G98, notify after install
- Network operator
- National Grid Electricity Distribution (South West)
One thing to sort before install: at the standard 1,200 mm roof-hook spacing the fixings fall short of the wind uplift. At 900 mm they pass. See section 2.
1. Placement
400 mm boundary DMEGC 465 W panel
| Household use | 2,700 kWh a year (Ofgem typical, example) |
|---|---|
| Panels to cover it | 7 |
| G98 limit | 7 panels (3.68 kW ÷ 465 W) |
| What the roof fits | 9, inside the 400 mm boundary |
| Designed | 7 panels, 3.25 kWp: one block from the eave |
| Face used | South, 35° pitch |
| Not used | North face (faces away; chimney), east and west hips (not needed) |
| Obstructions | Soil vent kept clear |
| Panel | DM465G12RT-G48HBB, 1762 × 1134 mm, 24 kg |
2. Wind, snow and fixings
EN 1991-1-4 UK NA + BRE Digest 489 · EN 1991-1-3 UK National Annex · combined to EN 1990 Expression 6.10
| Basic wind speed, map (south west) | 23.0 m/s |
|---|---|
| Altitude 40 m, factor | 1.04 |
| Basic wind speed | 23.92 m/s |
| Peak velocity pressure, 7.5 m, open terrain | 784.4 Pa |
| Net uplift coefficient (BRE 489, central zone) | -1.3 |
| Design uplift (× 1.5) | 1.530 kN/m² |
| Less dead load (15 kg/m²) | 0.147 kN/m² |
| Net uplift on the fixings | 1.382 kN/m² |
| Snow zone | 1 |
|---|---|
| Ground snow load, zone base | 0.30 kN/m² |
| At 40 m altitude | 0.336 kN/m² |
| Shape coefficient at 35° | 0.667 |
| Roof snow load | 0.224 kN/m² |
| Panel front load rating | 5,400 Pa |
| Case | Undrifted. Drift not calculated: the report says so. |
| Hook spacing | Fixing capacity | Net uplift | Result |
|---|---|---|---|
| 1,200 mm | 1.172 kN/m² | 1.382 kN/m² | Fails: engineer review |
| 900 mm | 1.562 kN/m² | 1.382 kN/m² | Pass |
Roof structure, rafter positions and hook spacing to be confirmed at survey. Dynamic analysis: not required, h < 15m, natural frequency > 5 Hz per EN 1991-1-4 §6.2.
3. Strings and inverter
IEC 62548 + manufacturer datasheets · coldest day -5 °C (south west), hot cell 70 °C
| Check | Value | Limit | Result |
|---|---|---|---|
| Open-circuit voltage on the coldest day | 274.36 V | 600.00 V | Pass |
| Short-circuit current per MPPT input | 15.88 A | 16.00 A | Pass |
| DC to AC ratio | 0.89 | 1.96 | Pass |
| Strings on the inverter inputs | 1 string on 2 MPPT inputs | 1 input per MPPT | Pass |
One string of 7 on MPPT 1. Panel Voc on the coldest day 39.19 V; Vmp hot 27.70 V; strings may be 2 to 15 panels on this inverter.
4. Network operator
| Route | EREC G98 — Notification (auto-connect, <=3.68kW/phase) |
|---|---|
| Why | 16.0 A/phase vs 16 A/phase G98 statutory limit (EREC G98/G99) — 1φ at 230 V nominal |
| When | Install, then notify the DNO within 28 days of commissioning |
| Form | G98 Form B: G98 Notification |
| MPAN | 2200001234569 · check digit valid · distributor 22 |
| Network operator | National Grid Electricity Distribution (South West) |
| Export | 3.68 kW, not limited |
| Under-voltage (Vφ-n −20%) | 184 V · 2.5 s |
|---|---|
| Over-voltage stage 1 (Vφ-n +14%) | 262.2 V · 1 s |
| Over-voltage stage 2 (Vφ-n +19%) | 273.7 V · 0.5 s |
| Under-frequency stage 1 | 47.5 Hz · 20 s |
| Under-frequency stage 2 | 47 Hz · 0.5 s |
| Over-frequency | 52 Hz · 0.5 s |
| Loss of mains (RoCoF) | 1 Hz/s |
Labels to fit (5)
- Main service point: "PHOTOVOLTAIC SYSTEM ON SITE" (BS 7671 §712.537.2.2.1.1)
- Point of interconnection (G100 scheme or back-feed): "UTILITY INTERCONNECTION — BACKFEED PRESENT" (BS 7671 §712 / ENA G100)
- DC isolator: "PV ARRAY D.C. ISOLATOR" (BS 7671 §712.537.2)
- DC junction / combiner box: "DANGER — CONTAINS LIVE PARTS DURING DAYLIGHT" (BS 7671 §712.537 warning)
- AC isolator + consumer unit: "SOLAR PV AC ISOLATOR — SWITCH OFF BEFORE WORK" (BS 7671 §712.537.2)
5. Single-line diagram
6. To confirm at survey
- Roof structure, rafter positions and the hook spacing (section 2)
- Earthing arrangement: TN-C-S, TN-S or TT
- Cut-out fuse rating and the consumer unit's main switch
The real report also carries the generation estimate (MCS method, with the cautious P90 figure beside it) and shading for each panel. They're left off this example.
See your own roof designed
Bring three addresses you're quoting this month. On a 30-minute Teams call I'll design them in front of you, and you'll get this report for each.
Book a demo with your addresses
Or ring me, Steven Hassall, on 07807 025270. I built Trident and I'll be the one on the call. Email works too: hello@trident-os.com.
If it isn't right for how you work, I'll tell you.